THE RENOVATION
Welcome Page
Once upon a time

Part 1 Part 2
The Early days
Part 1 Part 2
Utilities
Life's little luxuries
Septic Tank Install
Electricity arrives
The first cottage
Part 1 Part 2
Part 3 Part 4
The second cottage
Clearing Out
Attic conversion
First Floor
Living Room
Kitchen / Dining
Swimming Pool
Part 1 Part 2
Later modifications
The Farmhouse
Bathroom Study
Bedroom Hallway
Kitchen Living Room
Music room Attic Bed
Exterior and Garden
Part 1 Part 2 Part 3
Part 4 Part 5
Before and After
REFERENCE PAGES
RETURN TO FRONTPAGE

THE SECOND COTTAGE - The first floor

The floor cutout for the new staircase from the ground to first floor. (This work was carried out prior to work starting on the attic to facilitate the transport of materials) The two oak uprights holding the attic main beam were replaced with three more substantial pieces.

We needed two bedrooms and a bathroom on this floor so the whole area was stud partitioned to provide this. As usual our plans were thrown away and the chalk came into its own again. The bathroom was positioned above the kitchen - once again choosing the optimum route for the waste pipe. As before, our planning revolved around the position of the WC!

The almost - finished hallway. The old beam was retained, although it has no useful purpose other than decorative. The only thing left to go into place was the balustrade. The floor was washed thoroughly, then treated with Brou de Noix and a final couple of coats of flooring grade satin acrylic varnish. We kept the original wall finish, just repairing and applying more limewash with a final coat of matt emulsion. To the left of the photograph you can just see the shelf which finished off the top of the new interior wall downstairs (more of that later).

Final finishing in one of the two bedrooms built around the staircase from the first floor to the attic. When I get some better photographs of the bathroom and other bedroom then I'll post them here.